Today.Az » Business » 874 thousand tons of crude pumped into BTC pipeline
16 April 2006 [21:47] - Today.Az


To date, 874 thousand tons of oil (6.5 million barrels) have been pumped into the Baku-Tbilisi-Ceyhan pipeline, AzerTAg reports.

The pipeline needs 10 million barrels of crude to be filled up.



Copyright © Today.Az