|
Official opening of the Turkish part of the pipeline and Ceyhan terminal will be held after the oil reached the terminal and filled in the tanker, AzerTAj reports.
Currently production tests are underway in Ceyhan terminal to make it completely ready the receive oil.
The 1768 km long pipeline connecting Sangachal terminal in Azerbaijan and the Turkish Mediterranean port Ceyhan needs some 10-mln barrel oil to be completely filled.