|
BTC annual capacity is 50mln tons.
Abdullayev said the 100th tanker carrying Azeri crude oil has lately sailed away from Ceyhan Port, APA reports.
He added construction in Kulevi Port, a port in Georgia acquired by SOCAR, will be complete in the first quarter, 2007.
The grant project of the millennium, Baku-Tbilisi-Ceyhan (BTC) Oil Pipeline, is delivering Azeri oil to Ceyhan, a Turkish port, via Georgia and Turkey.
The pipeline came on line on June 13, 2006.