|
In 2006 the construction and commissioning of the SCP was successfully completed in 2006 and it was tied-in with the Turkish pipeline system at the Georgian-Turkish border in December. The pipeline is currently filled with commissioning gas and is ready to deliver gas to Azerbaijan, Georgia and Turkey, APA reports.