|
As APA reports, during this period 392.65m cu m of dry gas were delivered to Azerigas against the planned 504.85m cubic meters with implementation of the forecast by 77.8 percent.
During this period SOCAR delivered 382.89m cu m, Oil and Gas Extraction Units 378.03m cu, Joint Ventures and Operating Companies 4.86 m cu m, Anshad Petrol 1.46m cu m, Consortium 128.73 mn cu m.