601.42mln cubic meters of gas were delivered to Azerigas against the planned 547.31mln cubic meters in February, 2007.
As APA reports, 461.85mln cu m of dry gas were delivered to Azerigas against the planned 418.02mln cu m in this period. A total of 1,229.04mln cubic meters of natural gas were delivered to Azerigas during January-February.