Malfunction caused 20-minute hold-up in Ganjlik subway of the Baku Metro at 09:50 today.
![](http://www.today.az/pictures/pic54013.jpg)
The traffic was restored at 10:08 as soon as the train that held up in the tunnel came out, the Baku Metro said.
Chief engineer Elbrus Muradov said the train stopped at a tunnel in Ganjlik subway due to a breakdown. He said the problem was addressed in 10-12 minutes.
/APA/