|
Turkey's Mak-Yol Inshaat Sanaye Turism ve Ticaret AS is the contractor, Azerbaijan's Azerinshaatservis is the subcontractor and Finnroad is the technical manager. The project lead-time is 18 months. The project also includes construction of a bridge and two road bridges. The 15meter wide highway will be in 4 tracks.
Alat-Astara highway is slated to be brought online by the end of 2009. APA-Economics